{"id":2126,"date":"2021-03-30T20:06:03","date_gmt":"2021-03-30T20:06:03","guid":{"rendered":"https:\/\/www.semanariotiempo.cl\/?p=2126"},"modified":"2021-03-30T20:06:03","modified_gmt":"2021-03-30T20:06:03","slug":"mop-inicio-licitacion-2-900-millones-para-pavimentar-10-kilometros-entre-lambert-y-santa-gracia","status":"publish","type":"post","link":"https:\/\/www.semanariotiempo.cl\/?p=2126","title":{"rendered":"MOP inici\u00f3 licitaci\u00f3n: $2.900 millones para  pavimentar 10 kil\u00f3metros  entre Lambert y Santa Gracia"},"content":{"rendered":"\n<div class=\"wp-block-image\"><figure class=\"aligncenter size-large\"><img decoding=\"async\" src=\"https:\/\/www.semanariotiempo.cl\/wp-content\/uploads\/2021\/03\/lambert-1024x683.jpg\" alt=\"\" class=\"wp-image-2127\"\/><\/figure><\/div>\n\n\n\n<p class=\"wp-block-paragraph\">La Direcci\u00f3n de Vialidad del Ministerio de Obras P\u00fablicas, dio inicio a la licitaci\u00f3n para el mejoramiento de 10 kil\u00f3metros de la ruta D-205 entre el la localidad de Lambert y el acceso a la mina de Santa Gracia, en el sector rural de La Serena.<br>\u201cNos pone muy contentos poder lograr pavimentaciones y mejoras viales en sectores que son rurales, pero que est\u00e1n muy cerca de la conurbaci\u00f3n, como La Serena en este caso. En este lugar tenemos producci\u00f3n minera y agr\u00edcola, pero sobre todo beneficiar a las familias que han ido poblando estos sectores, por tanto debemos entregar una soluci\u00f3n de alto est\u00e1ndar\u201d, destac\u00f3 el titular del MOP en la regi\u00f3n, Pedro Rojas Onfray..<br>El proyecto de pavimentaci\u00f3n de la ruta D-205 entre Lambert y Santa Gracia podr\u00eda alcanzar una inversi\u00f3n cercana a los 3 mil millones de pesos. Las aperturas de las ofertas t\u00e9cnicas y econ\u00f3micas para la adjudicaci\u00f3n de esta iniciativa, se desarrollaran el pr\u00f3ximo 9 y 21 de abril, respectivamente.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La Direcci\u00f3n de Vialidad del Ministerio de Obras P\u00fablicas, dio inicio a la licitaci\u00f3n para el mejoramiento de 10 kil\u00f3metros de la ruta D-205 entre el la localidad de Lambert y el acceso a la mina de Santa Gracia, en el sector rural de La Serena.\u201cNos pone muy contentos poder lograr pavimentaciones y mejoras viales [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"tdm_status":"","tdm_grid_status":"","footnotes":""},"categories":[1],"tags":[8,5],"class_list":["post-2126","post","type-post","status-publish","format-standard","hentry","category-uncategorized","tag-marketing","tag-website"],"_links":{"self":[{"href":"https:\/\/www.semanariotiempo.cl\/index.php?rest_route=\/wp\/v2\/posts\/2126","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.semanariotiempo.cl\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.semanariotiempo.cl\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.semanariotiempo.cl\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.semanariotiempo.cl\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2126"}],"version-history":[{"count":0,"href":"https:\/\/www.semanariotiempo.cl\/index.php?rest_route=\/wp\/v2\/posts\/2126\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.semanariotiempo.cl\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2126"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.semanariotiempo.cl\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2126"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.semanariotiempo.cl\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}